Screed for a bathroom or wet room
A wet room floor is screeded in sand and cement, shaped to fall to the drain at between 1 in 80 and 1 in 35. Liquid screed cannot hold a slope. The screed is then tanked with a waterproof coating before it is tiled. A bathroom is a small floor, so it is priced on the call.
A floor shaped so the water runs to the drain.
Free, no obligation. One local screeder prices it, not five.
- 1 in 80the gentlest fall to the drain
- 1 in 35the steepest
- €14.6425 kg bag of screed, with VAT
- 24–48 hrsbefore you walk on it

Why the fall matters
Water runs where the floor sends it. In a level-access shower the floor is the tray, so it has to slope to the drain from every side. A fall of 1 in 80 drops 12.5 mm over a metre. Steeper than 1 in 35 is awkward to stand on.
Sand and cement screed is mixed nearly dry and holds whatever shape it is trowelled to. The screeder sets the drain at the low point and works the falls up to the walls and the door.
Price your screed
Four taps and the guide price is on screen. Your name and number come last, and only if you want a local screeder to price the floor properly.
A floor screed, one room under 25 m², in sand and cement: €22–€34/m², minimum charge applies.
How the price is worked out
It is the area multiplied by our guide rate: €22 to €34 a m² for sand and cement screed supplied and laid, and €24 to €36 a m² for liquid screed poured. One room under 25 m² is not priced by the m², because the pump, the crew and the delivery cost the same for a small floor as for a big one. Insulation, membranes, underfloor heating pipes and any digging out are separate lines. The screeder gives the firm price after seeing the drawings or the floor.
A bathroom screed, step by step
- Set the drain. Its height fixes everything else. The trap needs room under the floor.
- Screed to falls. Sand and cement, shaped from the drain out.
- Let it dry. Tanking does not stick to a wet screed.
- Tank it. A waterproof coating over the floor and up the walls, with tape at the corners.
- Tile. Small tiles follow a slope better than big ones.
On a timber floor upstairs
An upstairs bathroom usually has a timber floor. A full screed is heavy, so the floor is normally formed with a shaped board or tray set into the joists, with a thin screed or adhesive bed only where it is needed.
The rest of a bathroom floor, outside the shower, can be level. Many people fall only the shower area and keep the tiles flat everywhere else.
Read next
Extension floor screedInsulation, pipes if you want them, then 65 mm of sand and cement or 35 mm of liquid.
Screed over underfloor heating25 mm over the pipes in liquid screed, and when the heat can go on.
Replacing an old concrete floorDig out, membrane, insulation, then the screed. The order and what each layer costs you in height.
What is under the screedHardcore, radon barrier, slab, insulation, pipes: the layers in an Irish floor.
How thick, job by jobFrom 25 mm stuck to the slab to 75 mm on insulation. One line per job.
Sand and cement or liquidWhich one suits a small room, a wet room, heating pipes or a whole house.Asked before the pour
What fall does a wet room floor need?
Between 1 in 80 and 1 in 35 towards the drain. 1 in 80 is 12.5 mm of drop for every metre.
Can liquid screed be used in a wet room?
Not for the sloped part. It finds its own level. It can be used in a bathroom with a shower tray, where the floor is flat.
How much does it cost to screed a bathroom?
A bathroom is well under 25 m², so it carries a minimum charge and is priced on the call. Many are done by the builder with bagged screed at about €14.64 a 25 kg bag.
Does a wet room screed need waterproofing?
Yes. Screed and tile grout both let water through. The screed is tanked with a waterproof coating before the tiles go down.
Everything on screed.ie
Screed by job
Before and after the pour

See the price before anyone rings
Tap the job, the area and the screed. If the figure suits, a single screeding contractor in your county rings you and prices the floor properly.