Floor screed in Tipperary

In Co. Tipperary, budget €22–€34 a m² for sand and cement screed and €24–€36 a m² for liquid, with the screed supplied and laid. That is €1,650–€2,550 for a 75 m² ground floor. One screeding contractor takes the floors in Clonmel, Nenagh and Thurles and the rest of the county.

Sand and cement or liquid, with the guide price on screen before anyone in Co. Tipperary rings you.

Free, no obligation. One local screeder prices it, not five.

  • €22–€34/m²sand and cement, laid
  • 62,056homes in Co. Tipperary (Census 2022)
  • 27%of them built before 1961
  • 802new homes finished in 2025 (CSO)

In Tipperary, the old floors come first

Old floors. 16,942 homes in Co. Tipperary were built before 1961, 27% of the county's 62,056 homes (Census 2022). Insulation under the floor was not part of how houses were built then. A deep renovation usually takes the ground floor out, puts insulation in and finishes with a fresh screed. Replacing an old concrete floor sets out the layers.

Radon. The EPA has results for 2,907 homes in Co. Tipperary, and 12% of them were above the reference level of 200 Bq/m³. So when a ground floor in the county is dug out, the new one gets a radon barrier, sealed at every lap, before the concrete is poured. What is under the screed shows where it sits.

New houses. 227 one-off houses were finished in Co. Tipperary in 2025, 28% of the 802 new homes completed there (CSO). On a one-off build the screed is booked by the owner or the builder, and it sets the date for every floor finish after it. Self-build floor screed covers the timing.

Heating. 60% of homes in Co. Tipperary heat with oil (Census 2022). A heat pump works well with underfloor heating, and underfloor heating needs a screed: 65 to 75 mm of sand and cement over the pipes, or about 50 mm of liquid. Screed over underfloor heating has the depths and the day the heat can go on.

Price your screed

Four taps and the guide price is on screen. Your name and number come last, and only if you want a local screeder to price the floor properly.

Screed on a replaced ground floor, about 40 m², in sand and cement, in Tipperary: €880 to €1,360, supplied and laid.

Step 1 of 5

What is the screed for?

Tap the nearest one. The screeder checks the detail on the call.

How the price is worked out

It is the area multiplied by our guide rate: €22 to €34 a m² for sand and cement screed supplied and laid, and €24 to €36 a m² for liquid screed poured. One room under 25 m² is not priced by the m², because the pump, the crew and the delivery cost the same for a small floor as for a big one. Insulation, membranes, underfloor heating pipes and any digging out are separate lines. The screeder gives the firm price after seeing the drawings or the floor.

Where the houses are in Co. Tipperary

  • Clonmel. 7,178 homes. 1,705 were built before 1961 and 1,486 since 2001. 61% heat with gas.
  • Nenagh. 3,854 homes. 604 were built before 1961 and 1,665 since 2001. 71% heat with oil.
  • Thurles. 3,304 homes. 879 were built before 1961 and 819 since 2001. 69% heat with oil.
  • Carrick-on-Suir. 2,325 homes. 725 were built before 1961 and 491 since 2001. 45% heat with gas.
  • Tipperary. 2,286 homes. 799 were built before 1961 and 566 since 2001. 66% heat with oil.
  • Roscrea. 2,048 homes. 498 were built before 1961 and 601 since 2001. 58% heat with oil.
  • Cashel. 1,769 homes. 343 were built before 1961 and 783 since 2001. 67% heat with oil.

Census 2022 figures. Smaller places are covered too. Your floor goes to the one contractor who screeds in Co. Tipperary, not to a call centre.

What a floor comes to in Tipperary

Extension or open plan (40 m²)

Sand and cement
€880–€1,360
Liquid screed
€960–€1,440

Ground floor (75 m²)

Sand and cement
€1,650–€2,550
Liquid screed
€1,800–€2,700

Whole house (110 m²)

Sand and cement
€2,420–€3,740
Liquid screed
€2,640–€3,960

59% of homes in Co. Tipperary are detached. Getting a pump to the door is rarely the problem on a site like that. The drive from the plant is, if you want liquid screed, because it is priced by the load and the distance.

One room is priced on the call. See screeding one room, and screed cost for what moves a price.

Asked in Tipperary

How much does floor screed cost in Tipperary?

About €22–€34 a m² in sand and cement and €24–€36 a m² in liquid screed, supplied and laid. A 40 m² extension is €880–€1,360 and a 75 m² ground floor is €1,650–€2,550 in sand and cement.

Do you cover all of Co. Tipperary?

All of it: Clonmel, Nenagh, Thurles, Carrick-on-Suir and Tipperary, and the country between them. Your floor goes to one contractor, and only that one.

Do floors in Co. Tipperary need a radon barrier?

A new house needs a radon sump everywhere and a sealed membrane as well in a High Radon Area. 12% of the 2,907 homes the EPA has results for in Co. Tipperary were above the reference level, so fit the membrane whenever a floor is opened to the ground.

Can I get liquid screed in Co. Tipperary?

Yes, where a mixer lorry can reach the house. It is poured 35 mm deep on insulation and 25 mm over heating pipes, and costs about €24–€36 a m².

Everything on screed.ie

A worker in wellies spreading wet floor screed across a floor with a dappling bar

See the price before anyone rings

Tap the job, the area and the screed. If the figure suits, a single screeding contractor in your county rings you and prices the floor properly.