A screeded floor in Co. Westmeath runs €22–€34 a m² in sand and cement or €24–€36 a m² in liquid screed, laid. For a 110 m² house that is €2,420–€3,740. The floor is priced by one contractor who works Westmeath, from Athlone to Rochfortbridge.
Sand and cement or liquid, with the guide price on screen before anyone in Co. Westmeath rings you.
Free, no obligation. One local screeder prices it, not five.
- €22–€34/m²sand and cement, laid
- 34,003homes in Co. Westmeath (Census 2022)
- 21%of them built before 1961
- 740new homes finished in 2025 (CSO)
Westmeath has a lot of floors to replace
Old floors. 7,024 homes in Co. Westmeath were built before 1961, 21% of the county's 34,003 homes (Census 2022). Few of them have any insulation below the floor, and some have no damp-proof layer either. Putting that right means a new floor from the ground up, and the screed is the last part of it. Replacing an old concrete floor sets out the layers.
Radon. The EPA has results for 965 homes in Co. Westmeath, and 8% of them were above the reference level of 200 Bq/m³. A rebuilt floor is the one chance to put a sealed membrane between the ground and the house, and it is done before the slab. What is under the screed shows where it sits.
New houses. 155 one-off houses were finished in Co. Westmeath in 2025, 21% of the 740 new homes completed there (CSO). Each of those had its floors screeded after the roof and windows went in, usually in a single day. Self-build floor screed covers the timing.
Heating. 50% of homes in Co. Westmeath heat with oil (Census 2022). A heat pump works well with underfloor heating, and underfloor heating needs a screed: 65 to 75 mm of sand and cement over the pipes, or about 50 mm of liquid. Screed over underfloor heating has the depths and the day the heat can go on.
Price your screed
Four taps and the guide price is on screen. Your name and number come last, and only if you want a local screeder to price the floor properly.
Screed on a replaced ground floor, about 40 m², in sand and cement, in Westmeath: €880 to €1,360, supplied and laid.
How the price is worked out
It is the area multiplied by our guide rate: €22 to €34 a m² for sand and cement screed supplied and laid, and €24 to €36 a m² for liquid screed poured. One room under 25 m² is not priced by the m², because the pump, the crew and the delivery cost the same for a small floor as for a big one. Insulation, membranes, underfloor heating pipes and any digging out are separate lines. The screeder gives the firm price after seeing the drawings or the floor.
Where the houses are in Co. Westmeath
- Athlone. 8,439 homes. 1,524 were built before 1961 and 2,933 since 2001. 44% heat with oil.
- Mullingar. 8,171 homes. 878 were built before 1961 and 3,139 since 2001. 48% heat with oil.
- Moate. 1,141 homes. 179 were built before 1961 and 595 since 2001. 31% heat with oil.
- Kinnegad. 980 homes. 31 were built before 1961 and 537 since 2001. 48% heat with oil.
- Kilbeggan. 561 homes. 105 were built before 1961 and 281 since 2001. 46% heat with oil.
- Castlepollard. 526 homes. 126 were built before 1961 and 213 since 2001. 60% heat with oil.
- Rochfortbridge. 516 homes. 103 were built before 1961 and 133 since 2001. 59% heat with oil.
Census 2022 figures. Smaller places are covered too. Your floor goes to the one contractor who screeds in Co. Westmeath, not to a call centre.
Whole-floor prices for Westmeath
Extension or open plan (40 m²)
- Sand and cement
- €880–€1,360
- Liquid screed
- €960–€1,440
Ground floor (75 m²)
- Sand and cement
- €1,650–€2,550
- Liquid screed
- €1,800–€2,700
Whole house (110 m²)
- Sand and cement
- €2,420–€3,740
- Liquid screed
- €2,640–€3,960
Just 53% of homes in Co. Westmeath are detached. For the others, say how the hose would reach the floor: through a side gate, a garage or the front door. The screeder prices that along with the area.
A single room does not follow these rates: screeding one room explains why. The seven things that shift a quote are on the screed cost page.
Asked in Westmeath
What does it cost to screed a floor in Co. Westmeath?
Our guide is €22–€34 for each m² of sand and cement screed and €24–€36 for liquid. A whole 110 m² house is €2,420–€3,740 in sand and cement or €2,640–€3,960 in liquid.
Is there a screeder near me in Westmeath?
Yes. One contractor takes every floor in Co. Westmeath that comes through this site, in Athlone, Mullingar and Moate and outside the towns.
Do floors in Co. Westmeath need a radon barrier?
A new house needs a radon sump everywhere and a sealed membrane as well in a High Radon Area. 8% of the 965 homes the EPA has results for in Co. Westmeath were above the reference level, so fit the membrane whenever a floor is opened to the ground.
Can I get liquid screed in Co. Westmeath?
Yes, where a mixer lorry can reach the house. It is poured 35 mm deep on insulation and 25 mm over heating pipes, and costs about €24–€36 a m².
Everything on screed.ie
Screed by job
Before and after the pour

See the price before anyone rings
Tap the job, the area and the screed. If the figure suits, a single screeding contractor in your county rings you and prices the floor properly.