Price, depth, drying, heating and what goes under it. Short answers, with the figures.

Free, no obligation. One local screeder prices it, not five.

  • €22–€34/m²sand and cement, laid
  • 65 mmleast depth on insulation
  • 24–48 hrsbefore you walk on it
  • 21 daysbefore the heat goes on
A laser level sitting on a bare concrete floor, throwing a green line across it

Price your screed

Four taps and the guide price is on screen. Your name and number come last, and only if you want a local screeder to price the floor properly.

Screed for an extension floor, about 40 m², in sand and cement: €880 to €1,360, supplied and laid.

Step 1 of 5

What is the screed for?

Tap the nearest one. The screeder checks the detail on the call.

How the price is worked out

It is the area multiplied by our guide rate: €22 to €34 a m² for sand and cement screed supplied and laid, and €24 to €36 a m² for liquid screed poured. One room under 25 m² is not priced by the m², because the pump, the crew and the delivery cost the same for a small floor as for a big one. Insulation, membranes, underfloor heating pipes and any digging out are separate lines. The screeder gives the firm price after seeing the drawings or the floor.

Every question

How much does floor screed cost in Ireland?

Floor screed in Ireland runs about €22–€34 a m² in sand and cement, supplied and laid, and €24–€36 a m² in liquid screed, poured. A 40 m² extension comes to €880–€1,360 in sand and cement. A 75 m² ground floor comes to €1,650–€2,550. One room is priced on the call, because a small floor carries a minimum charge.

How thick does a floor screed have to be?

Sand and cement screed is 25 mm at the least when it is stuck to the slab (40 mm is usual), 50 mm on a membrane and 65 mm on insulation in a house. Liquid screed goes thinner: 25 mm stuck down, 30 mm on a membrane, 35 mm on insulation and 25 mm over the top of heating pipes.

How long does screed take to dry?

Allow a day for every millimetre for the first 50 mm of sand and cement screed and two days for every millimetre after that. A 65 mm screed needs about 80 days before a floor that minds damp goes on it. Liquid screed dries at a day a millimetre up to 40 mm. You can walk on either after 24 to 48 hours.

When can I walk on a new screed?

After 24 to 48 hours for light foot traffic. Keep heavy loads off it for the first week.

When can the underfloor heating go on?

After 21 days for a sand and cement screed and 7 days for a calcium sulphate liquid screed. Bring the water temperature up in steps over about a week, hold it, then bring it down the same way.

How dry must a screed be before the floor goes down?

A cement screed must read 75% relative humidity or less on a hygrometer. A calcium sulphate liquid screed is tested by carbide bomb: 0.5% moisture or less, and 0.3% over underfloor heating.

Which is cheaper, sand and cement or liquid screed?

Sand and cement, by a euro or two a m²: €22–€34 against €24–€36. Liquid goes down thinner, so on a big floor with heating pipes the totals come close.

Can a screed be laid to a slope?

Sand and cement can. It is how a wet room floor is shaped to the drain, at a fall between 1 in 80 and 1 in 35. Liquid screed finds its own level and cannot hold a slope.

Is screed the same as concrete?

No. Concrete has stone in it and is the structural slab. Screed is the finer layer on top that gives a flat surface for the floor finish.

Does a screed need insulation under it?

In a heated room on the ground floor, yes. A new or rebuilt floor has to meet Part L of the Building Regulations, and the insulation boards go between the slab and the screed.

Does a new floor need a radon barrier?

A new house gets a radon sump under the floor everywhere in the country, and a sealed radon membrane as well in a High Radon Area. That is Technical Guidance Document C. Most builders fit the membrane everywhere, because it doubles as the damp-proof layer.

How heavy is a floor screed?

About 2,100 to 2,200 kg a cubic metre. One m² at 65 mm deep weighs 136–143 kg. That is why an upstairs timber floor is checked before a screed goes on it.

How long does it take to screed a house?

A day for most houses. Liquid screed is quicker again: a whole ground floor is poured in a morning.

Do I have to move out while the screed dries?

Not for the drying. You stay off the floor for a day or two, and that part of the house is out of use until then.

Which counties do you cover?

All 26 counties of the Republic. Pick your county on the last step of the planner and the floor goes to the screeder who works there.

Everything on screed.ie

A worker in wellies spreading wet floor screed across a floor with a dappling bar

See the price before anyone rings

Tap the job, the area and the screed. If the figure suits, a single screeding contractor in your county rings you and prices the floor properly.