In Co. Kerry, budget €22–€34 a m² for sand and cement screed and €24–€36 a m² for liquid, with the screed supplied and laid. That is €1,650–€2,550 for a 75 m² ground floor. One screeding contractor takes the floors in Tralee, Killarney and Listowel and the rest of the county.

Sand and cement or liquid, with the guide price on screen before anyone in Co. Kerry rings you.

Free, no obligation. One local screeder prices it, not five.

  • €22–€34/m²sand and cement, laid
  • 58,179homes in Co. Kerry (Census 2022)
  • 20%of them built before 1961
  • 722new homes finished in 2025 (CSO)

Kerry floors and the radon under them

Radon. The EPA has results for 4,562 homes in Co. Kerry, and 17% of them were above the reference level of 200 Bq/m³. A rebuilt floor is the one chance to put a sealed membrane between the ground and the house, and it is done before the slab. What is under the screed shows where it sits.

New houses. 291 one-off houses were finished in Co. Kerry in 2025, 40% of the 722 new homes completed there (CSO). On a one-off build the screed is booked by the owner or the builder, and it sets the date for every floor finish after it. Self-build floor screed covers the timing.

Old floors. 11,422 homes in Co. Kerry were built before 1961, 20% of the county's 58,179 homes (Census 2022). Houses of that age were normally built with nothing under the floor to keep the heat in. When one is renovated, the ground floor is often dug out and rebuilt, with a new screed as the top layer. Replacing an old concrete floor sets out the layers.

Heating. 63% of homes in Co. Kerry heat with oil (Census 2022). If you are moving to a heat pump with underfloor heating downstairs, the pipes go on new insulation and the floor is screeded over them, 25 mm above the pipe in liquid screed. Screed over underfloor heating has the depths and the day the heat can go on.

Price your screed

Four taps and the guide price is on screen. Your name and number come last, and only if you want a local screeder to price the floor properly.

Screed on a replaced ground floor, about 40 m², in sand and cement, in Kerry: €880 to €1,360, supplied and laid.

Step 1 of 5

What is the screed for?

Tap the nearest one. The screeder checks the detail on the call.

How the price is worked out

It is the area multiplied by our guide rate: €22 to €34 a m² for sand and cement screed supplied and laid, and €24 to €36 a m² for liquid screed poured. One room under 25 m² is not priced by the m², because the pump, the crew and the delivery cost the same for a small floor as for a big one. Insulation, membranes, underfloor heating pipes and any digging out are separate lines. The screeder gives the firm price after seeing the drawings or the floor.

Where the houses are in Co. Kerry

  • Tralee. 10,185 homes. 1,657 were built before 1961 and 2,809 since 2001. 57% heat with oil.
  • Killarney. 4,866 homes. 636 were built before 1961 and 1,449 since 2001. 59% heat with oil.
  • Listowel. 2,053 homes. 353 were built before 1961 and 762 since 2001. 62% heat with oil.
  • Castleisland. 1,009 homes. 202 were built before 1961 and 310 since 2001. 53% heat with oil.
  • Kenmare. 970 homes. 112 were built before 1961 and 527 since 2001. 50% heat with oil.
  • Killorglin. 915 homes. 151 were built before 1961 and 384 since 2001. 63% heat with oil.
  • Ballybunion. 702 homes. 175 were built before 1961 and 217 since 2001. 56% heat with oil.

Census 2022 figures. Smaller places are covered too. Your floor goes to the one contractor who screeds in Co. Kerry, not to a call centre.

What a floor comes to in Kerry

Extension or open plan (40 m²)

Sand and cement
€880–€1,360
Liquid screed
€960–€1,440

Ground floor (75 m²)

Sand and cement
€1,650–€2,550
Liquid screed
€1,800–€2,700

Whole house (110 m²)

Sand and cement
€2,420–€3,740
Liquid screed
€2,640–€3,960

In Co. Kerry, 66% of homes are detached, most on their own site. A pump or a mixer can usually stand close to the door, which keeps the laying quick. For liquid screed the distance from the batching plant matters more than the distance from the road.

One room is priced on the call. See screeding one room, and screed cost for what moves a price.

Asked in Kerry

What does it cost to screed a floor in Co. Kerry?

Our guide is €22–€34 for each m² of sand and cement screed and €24–€36 for liquid. A whole 110 m² house is €2,420–€3,740 in sand and cement or €2,640–€3,960 in liquid.

Who screeds floors in Co. Kerry?

One screeding contractor covers the county, Tralee, Killarney and Listowel included. Price the floor above, send it, and they ring you.

Do floors in Co. Kerry need a radon barrier?

A new house needs a radon sump everywhere and a sealed membrane as well in a High Radon Area. 17% of the 4,562 homes the EPA has results for in Co. Kerry were above the reference level, so fit the membrane whenever a floor is opened to the ground.

How long does a new screed take to dry in Kerry?

A day for every millimetre for the first 50 mm of sand and cement, then two days a millimetre. A 65 mm screed needs about 80 days in an aired house, and longer in a damp winter.

Everything on screed.ie

A worker in wellies spreading wet floor screed across a floor with a dappling bar

See the price before anyone rings

Tap the job, the area and the screed. If the figure suits, a single screeding contractor in your county rings you and prices the floor properly.